West Chestnut Hill Expansion 2009
Construction Begins - Footers!
Foundation
Rebar in Walls
Pouring Basement and Garage Walls (11/5/09)
First Floor Goes Up (11/11/09)
Second Floor Begins (11/16/09)
ThirdFloor Begins (11/20/09)
Radiant Heat in the porch and basement
(11/16 and 11/22)
Rafters Added (11/23/09)
Roof On the House, Rafters on the
Garage (11/30/09)
Buttoning it up, adding the Porch (I12/15/09)
Now for the Workshop, and some snow.
Then Stucco happens in three phases 1
2 3
Click on images and links below for full resolution:

Before

After
3D Line Drawing
Front DPF
3D line Drawing
Back PDF
3D




Basement

Basement Dims PDF
Basement Rear View-Wire
Basement Rear View-Solid
Basement C0nstruction Notes
First Floor

First Floor + Garage Dims
External PDF
First Floor + Garage Dims
Internal PDF
First Floor Only Dims
Second Floor

Second Floor Ext Dims PDF
Second Floor Int Dims PDF
Third floor
Third floor Ext Dims PDF
THird floor Int DIms PDF
Elevations
North
West
South
East
Lines and Grades
L&G - Final (I hope!)
L&G 7/11/09 - Septic mislocated and
basement walkout too deep.
Older Drawings





Older Plans in PDF format:
Basement Plan Ext Dims.pdf
Basement Plan Int Dims.pdf
Basement PlanDimsl.pdf
E102 Elev Test-E102
Elev Test.pdf
E102
Everything
View
NE2-pdf
E103
Everythign
View
SW2.pdf
First Floor Plan-ExtDims.pdf
First Floor Plan-IntDims.pdf
First Floor Plan-Model.pdf
Garage + First Ext-Dims.pdf
S101 Section
All-S101 Section All.pdf
S101 Section
NW-S101 Section NW.pdf
S102 Section
EW-S102 Section EW.pdf
Second Floor
Plan-ExtDimsl.pdf
Second Floor
Plan-IntDimsl.pdf
Third Floor Plan-Ext
Dims.pdf
Third Floor
Plan-Int-Dimsl.pdf
Specifications and calculations
In Excel format
Surveys (11x17 format pdf)
Mortgage (2003)
Garage Lines and Grades (1997)
Septic Layout (1993)
Proposed Lines and Grades 2009 R1